Liquid Roof Overlay

The problem

The office roof area was suffering from water ingress due to age and deterioration. The water ingress was impacting the work environment below. The felt roof with chippings was aged with the existing dome roof lights deteriorated and brittle. The roof was in need of refurbishment without disruption to the work area directly below.

The Solution

Cornerstone Group attended the site and through discussions with the client proposed a liquid roofing system be overlaid and new dome rooflights installed.

The area was cleared of the limestone chippings and the existing felt system was cleaned and prepared to a high standard ready to receive a new coating system.

The chosen system was an IKO Polimar liquid consisting of a base layer with reinforcement matting with a UV staple topcoat applied. The existing roof lights were removed from the site and new triple-skin polycarbonate dome roof lights were installed to allow more natural light to enter the building.

© Copyright - Cornerstone Group. Design and build by Focus & Co.